Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The PP proposes fiscal bonuses, change the Urban Plan, more police and 4 million euros in investments in the next 2 years for our districts (22/05/2019)

• It also proposes a specific study of urban transport for the communication of high districts, and promote Rural Tourism as a stimulus factor for the economic diversification of our municipal area.

The Mayor of Lorca, Fulgencio Gil, has informed of the implementation of a plan to contribute to the development of the districts, which has 4 fundamental axes: tax and rate reductions, increase in citizen security, promotion of rural tourism and a catalog of more than 170 investments to execute during the next years in each and every one of our deputations.

For the next few years we propose a series of projects that benefit all the districts, both globally and with specific actions that neighbors have proposed in the meetings we have had with them.

The first one will be to complete the update of the Urban Planning Plan, following our commitment to put Urbanism at the service of people, reviewing urban and developable land, adapting it to real and current needs and putting value on the development of industrial land .

Less taxes, more services.

The aim is to extend the bonuses in the IBI and work permits for the establishment of residents in the districts, as a tool to fix population in them and fight against depopulation.

To do this we will establish tax credits for the restoration of first residence, as well as the development of a beautification project for urban rural areas.

Other measures in this same line will be to develop a specific study of the real needs of public transport in the high districts, both with the center of Lorca and between them with the objective of establishing a bus service interpedanías with flexible schedules and low prices .

The staff of the Rapid Intervention Brigade, BIR, will be increased to respond more quickly and carry out improvement and reparation actions in the different deputies.

Citizen security

It will proceed to increase the staff of Local Police in 30 troops, increase mobile patrols in districts and a new plan to install video surveillance cameras, according to the requests of their neighbors.

We will also demand the increase of the National Police and Civil Guard of the municipality, to increase surveillance and presence at street level and on the way.

Rural tourism

We bet to encourage guided visits to the different facilities of the traditional economic fabric of the high districts, such as wineries, quarries, distillation plants of aromatic plants, textile facilities ... as an attractive resource of rural tourism in the area.

We propose to promote the visits of schoolchildren from the city of Lorca to farms and farms and livestock so that they know our wealth.

It is a question of revaluing the different places and archaeological remains of the area as well as the valorization of the typical landscape of the territory to elaborate an attractive proposal of rural tourism.

We advocate for the promotion of the rural and cultural heritage of our municipality, as well as the rescue of the material and immaterial heritage of the area.

From the PP will proceed to the development of a map of trails, trails and rural roads to make it a tourist product, as well as to promote caravan tourism throughout the municipality.

This plan includes a catalog of 150 new actions in districts, which gather the requests that have been transferred to us by our neighbors in the periodic work meetings we had been holding with them.

The complete list is the following:

Aguaderas: Arrangement of Roads of La Peladilla, Real, Malvaloca and termination of the RM-D8 from Rambla del Mesillo to Cruce de Campo López.

Creation of a playground

Almendricos: Repair of Calle Mayor and Adjacent, Carretera de La Campana, remodeling of RM-D17, service lane of the Trasvase canal, rehabilitation of the Cocherón railway station to create the Museum of Mining and Railway.

Avilés: Repair of social premises and improvements to the plaza of the social premises, diversion of heavy traffic to avoid the passage of trucks through the town center.

Barranco Hondo: repair of communication routes.

Béjar: Repair of Carrancho, Casarejos de Abajo, Cuesta de Mellado and Navarros roads.

Campillo: Repair of Las Zahurdas, Quijero, La Almenara, Hondo, De la Cruz, Vera and Azagahor roads.

Old school repair for social premises.

Enlargement Road Boquera de Ponce.

Carrasquilla: Arrangement of the lookout and air conditioning of the social premises.

Cazalla: Bridge Crossing Repair Ronco.

Enlargement Public lighting and telephony of Camino Feli, repair of the park and the sports track, extension of public lighting in Camino Puente Alto.

Creation of a greenway in the Carril del Vela to connect with the Ctra. De Águilas and the Central Way.

Make the path of the Crossing of the Association a cycle path.

Reasfaltado of the Ctra.Águilas of the section from Barrio San Fernando to Gasolinera del Mora, introducing the bike lane.

Public lighting in Caminos Central, Almohijar, Porro and Puente Ronco, and creation of Carril Bici in Puente Alto.

Coy: Arrangement of rural roads, streets of the urban nucleus and renewal of services such as sanitation and potable water network.

Extension of the leisure area of ​​the beach.

Renovation of playgrounds in parks and asphalted entrance to the cemetery.

AC

Doña Inés: Arrangements Caminos El Pocico and Sudadores, paving of several streets and improvement of signage.

Fontanares: Repair of roads and installation of children's games and equipment of gerontogimnasia.

Garrobillo: Improvement and repair of roads, installation of children's games and equipment of gerontogimnasia.

Hinojar: Paving Path of the Condomina, arrangement of the Ways of Sale Figs and RM-D1

Humbrías: Arrangement of the Navarros and Los Jirones Roads.

Jarales: Repair of the Alquería and Los Morotes roads.

The Listening: Repair Roads of the Hermitage Old Mill, Cat and Abbots, Repair of parks.

Expansion of street cleaning and provision of container service in Nueva Noria.

La Hoya: Construction of the bike path from Las Palmeras Gas Station to the urban center of La Hoya.

Paving arrangement from the El Chicharra Sale and exit from the highway and public lighting.

Fix sidewalks from the roundabout at the height of Pividal Workshop to station.

Continuation of the Crossing.

Remodeling of the Way Vignettes.

Remodeling Camino Caracoleros and adjacent, Camino Toyos and Cruce del Río.

Public lighting in the RM-D3.

La Paca: Repair of Roads Up to Humbrías, Depuradora, Habares and De La Huerta.

Embellishment of accesses to the urban nucleus and creation of sidewalks.

Coverage of the esplanade of parties for multiple uses.

Execution of projects for the collection of rainwater for irrigation.

Repair of several streets and water treatment plant in Las Terreras.

The Parish: Remodeling of access roads to the cemetery, school environment, Cortijo Las Palas.

Adequacy and improvement of the pool and its surroundings.

Re-paving of streets in the urban core.

Consolidation of the Castles of Xiquena and Tirieza.

Marchena: Repair of roads of Narciso Yepes School, Manzanares, Condomina, Pocico.

Public lighting Carrasco-Condomina section, creation of bike lane and greenway.

Creation of the sanitation network connection from Infanta Leonor Urbanization to La Hoya WWTP.

Arrangement of Highway D7 to the Rambla.

Morata: Repair of Montajú, Perichanes, Puerto Muriel and Viquejos roads.

Adaptation of the social premises of the Old Discotheque.

Nogalte: Repair roads and roads from Henares to Nogalte, Pots, Rope to Simones, Cortijo Romeros, La Jara and expansion of the potable water supply network.

Parrilla: Repair of roads of Cejo and Rambla El Cambrón.

Repair and improvement of the park.

Side enclosure of the sports court.

Toilets in the vicinity of the sports court.

Well Higuera: Paving of streets, covering of soccer field for creation of zone of leisure.

Creation of a new playground and television repeater in La Campana.

Pulgara: repair of roads Monjero, Carril del Noble, Saplings of Mata, as well as widening of the pedestrian margin Camino Puente del Chavo and improvement Camino Reverte crossing.

Public lighting Carril de Paco Reverte and from Local Social to Camino del Chavo.

Covering the sports track.

Puntarrón: Road improvements and installation of drinking water network.

Purias: Repair of Valencian roads, Miras, Torre del Obispo, of La Torre, Malvaloca, Pedro and Cati, construction of a new playground, adaptation of the environment of the multipurpose pavilion, arrangement of the Camino del Sastre as it passes through the Rambla, remodeling of the premises of young people for the playground.

Ramonete: Road Repair.

Arrangement Plaza and Atrium of the Church.

Repair room attached to the Church.

Enlargement of public lighting on the section of road access to Calnegre.

Sanitation collectors.

River: Road Repair Connection MU-701 and C-15, Casa Olivera, Lugarico Las Canales, Lemon trees, Caravaca road, Gallardo, improved access to the cemetery.

Improvement and creation of a pedestrian area on the C-15 from Ctra. Caravaca to the A-7 motorway.

Repair of the road passage under the A-7 motorway.

Tercia: Repair of Roads of the Oils, Vereda Zamora, Churra and Vereda of La Palma, Irrigation, The Liforos, Pina, Mojón and Villaespesa.

Arrangement and repair of the Villa Tercia Park.

Creation of greenways with the spaces created with the modernization of irrigation.

Coverage of school sports tracks.

Remodeling of the old N-340 from Apolonia to junction with Ctra. Villaespesa with the creation of a bike path.

Tiata: Improves the Camino Parada de Los Segura.

Creation of a pedestrian margin.

Repair of the Vereda de Los Reales.

Repair of the stretch of the old road from Águilas from Barrio San Fernando to the gas station, creating a bike path that connects with existing ones.

Torrealvilla: Remodeling of the Zúñiga park.

Sanitation collectors.

Water treatment plant

Repair of parks and roads.

Repair of streets in Torrealvilla and Zúñiga and improvement of the entrance to Torrealvilla.

Torrecilla: Repair Camino Los Pascuales, Rambla Alcor, Jara, Riders, Camping Torrecilla, Repair sports tracks.

Repair and extension of street lighting Camino Zahurdas y Alberquilla.

Completion of the collector from Saprelorca to Rambla Biznaga.

Coverage of space for parties.

Zarcilla de Ramos: Repair Caminos Misqueruela, Reverte, El Rincón and La Parra.

Toilets for market and parties.

Adaptation and improvement of the garden around the pool.

Improvement of several streets of the urban nucleus.

Expansion and creation of the pedestrian margins of the Zarcilla al Rincón.

Zarzadilla de Totana: Road and Diversion Arrangement.

Termination of the RM-C9.

Processing of television repeaters.

Paving of several streets of the urban nucleus.

Zarzalico: Covering and closing of the side of the Church to celebrate holidays and other activities of the adjoining districts.

Source: PP Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información