Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The remodeling of the Plaza del Ibreño of Lorca renewed infrastructure and all basic service networks (15/08/2016)

The works have a budget of 242,000 euros, financed by the Ministry of Public Works, and have been executed by the City

The Minister of Public Works and Infrastructures, Pedro Rivera, and the mayor of Lorca, Francisco Jodar, inaugurated the renovations that have taken place in the square Ibreño and Marsilla street of the Barrios Altos city of Lorca, who have had a budget of 241,922 euros.

"It is an example of recovery of landmarks in the historic center of Lorca for the enjoyment of residents, thanks to the collaboration and commitment to the region", said the Minister of Public Works, who said that the city "is recovering slowly without pause the splendor I had and deserve. "

The Minister Pedro Rivera remarked that since his department and in coordination with the City, "are reshaping the squares and streets so that residents can enjoy these common spaces, equipped with better infrastructure and services and to share their free time" .

The performance has covered a total area of ​​1,280 square meters with the renovation of the general supply networks, sanitation and rainwater, for what have been installed ductile iron pipes and polymerization of vinyl chloride monomer colored tile.

As for the lighting of the square, it has made the underground pipeline pipes for the installation of street lighting and the replacement of 15 lights led type.

They have also been buried low-voltage lines and telecommunications networks, as well as containers of organic matter.

The work also included the renovation of the paving.

In the first section of the street Marsilla has given priority to pedestrians, allowing the movement of vehicles at low speed below 20 kilometers per hour, and accessibility, with the pavement prefabricated cobblestone entire width of the street without differentiation level between driveways and sidewalks.

In the square it has been used prefabricated pavement aged cobble color, three rectangular shapes combined over the entire surface.

The works of the square are part of the planning of actions planned by the Autonomous Region in the historic city center, funded by the contracted with the European Investment Bank (EIB) and implemented by the city of Lorca loan.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información