Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

Marisol Sanchez: "The works of Santa Rosa de Lima incur currently in illegalities" (09/05/2012)

The deputy spokesman Socialist, Marisol Sanchez, has begun his appearance before the media denouncing "a Regional Government who live appearances, as shown again after the visit of the Minister of Health to Santa Rosa de Lima".

Sanchez has detailed that "the seven plants which account this center has only been noticed by 30% (levels 0, 3 rd and 4 th), which is what was the Minister. Other plants, why not Mrs. Palacios paced, clear signs of lack of cleanliness, toilets that decorum prevents them from being used, peeling walls, dirty windows, the remains of disused furniture obstructing the passage in the halls, lights hanging from cables without further protection for the user, with the danger that entails, we are going, a real nonsense. This was Marisol Sanchez showed the council through a detailed photo essay that shows the current state of indecency which is the remaining plants being currently used by the people of Lorca. "

The mayor Lorca continued to deny that "the investment does not correspond to earthquake-related work showing anterior chamber Speaking III Area Manager of Health, Mr. Albarracin, made in April 2011, which stated," We hope that summer before the completion of the work.

That's when the move is done Lorca Center in Santa Rosa de Lima. "What confirms that these are works that should have been completed last June."

The council has taught media photos where the project report describes the approaches to the center and pictures of the planes of the center as they should have been

Social responsibility has stressed that "what yesterday taught the Minister is pure makeup and does not reflect reality. They return to lie citizens exhibiting a Level 0, 3 rd and 4 th that looked like a five star hotel while plants that are actually being used (levels 1 st, 2 nd, 5 th, 6 th and 7 th) by over 30,000 users assigned to this center, have a state gloomy, unworthy and unhealthy, more characteristic of a roadside motel. also have the nerve to come to inaugurate works that can not be used because the plants 3 rd and 4 th lack any type of equipment and it is uncertain when there will be items available to them in operation, so they come to look palmetto without resolving anything and what they have opened are some steep stairs covered with glass and halogen who were eliminated in the proposed work and replaced by a level crossing the street. That is, an illegal entry. "

Jódar Sanchez stressed that "also speak of works that engage in illegal work performed since they have nothing to do with as indicated in the license application that was issued to Urbanism in stating that:" The center has a main access street to street level Floridablanca adapted for people with disabilities leading to the elevators distributed to different plants.

There is also access to the rear at ground floor level of emergency, has ramps adapted for people with misnusvalías and connected to the elevators. "This is absolutely false, in violation of the rules of accessibility. None of this exists. Be recalled that 35% of users of this center are over 65 years, many have limited mobility and do not know if they handle the option of providing access to the street Floridablanca launching the disabled through a ramp. A real nonsense. That also reproduced in the case of persons carrying carts with children and do not forget that in this center there are three consultations of Pediatrics. "

Marisol Sanchez has reported that "yesterday in Urban personamos us to see the building permit, the project and the plans and have asked that we provide copies. Seems clear that the CARM has taken out a license with a project and then have run another. Apparently, the Regional Government has thought it is above the law. We will require that from Town Planning to inspect the works because, as mentioned, not correspond to the request and fail to meet accessibility standards. "

Sanchez finished Jódar stressing that "this seems very serious cosmetic operation of the Regional Administration, with his usual self-congratulation, has been to mislead the grave as Lorca and especially users of Santa Rosa de Lima, the which at present is a real trap. "

Source: PSOE Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información