Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The City Council allocated more than 336,000 euros to improve Nogalte Street, from the Solidarity Fund of the European Union (08/03/2013)

Councilman Works and Municipal Services City of Lorca, Angel Mecca, this morning the proposed improvement works has been prepared for the renovation of the street Nogalte.

Mecca has emphasized that "one of the priorities for action from the city council that we had on the table was the renewal and overall improvement Nogalte Street. Works will consist basically in changing the existing firm, relieving asphalt pavers for. shall arise to replace the existing pavement by a causeway at different levels. This will have an asphalt base. curb shall be installed to the curb of the sidewalk, which will improve its current width, and will serve to delineate steely area to the road. Switching to asphalt has been a highly sought unanimous request by residents, assuming also the ideal solution from the technical point of view to improve road safety and end the problem of "dance" cobblestone is logged every time it rains.

Works Councilman noted that "this action will be funded in full by the Solidarity Fund of the European Union.'re Talking about an investment of EUR 336,380.77. Repair is the damage caused by the earthquake of 2011. works are expected to begin by the end of next April, avoiding interference in the different acts that take place in this historic street, especially at Easter dates ".

The contemplated improvements planned intervention in an area over 4,000 square meters.

Includes improvements in road safety, improved crosswalks at the height of gully junction of San Lazaro (relocating and building steps barbicans) and the height of the church of San Francisco.

Will also improve horizontal and vertical signage and expanded areas for loading and unloading.

Improved sidewalks involves the removal of the flower beds, which have been so bad, and will be replaced by a paving slab, identical to the existing one.

This will increase the traffic surface for pedestrians.

It should explain that it will improve the state of the current trees, keeping the number of trees and installing a series of surface alcorques porosit type, which are passable.

The project involves improving the street full of its approximately 270 meters.

Regarding lighting, the lamps will remain current for its proven good answer.

Also be involved in the confluence of the streets of San Francisco Cuesta Lope Gisbert, an enclave in which shall be the existing slope correction.

They enable a platform to solve agglomerate incidences of flooding in rain events.

This will replace the pavement for its poor response, proceeding to asphalting an area of ​​250 m2 approx.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información