Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The reconstruction process gets a boost (29/05/2013)

These building permits buildings "Viña V" and Marsilla.

The number of homes for reconstruction achieved with this new step 490.

The "Vineyard V" is the first building that has PERI requested permission, while the Marsilla is also the first grade two licensed protection.

The Town Planning Council of Lorca, José Joaquín Peñarrubia, reported on the achievement of further progress in the process of rebuilding the city after the earthquake of 2011.

This is the grant of new licenses to re-build a total of 64 new homes and 114 parking spaces.

We are talking about a new momentum that allows us to take another step on the road to physical and social reconstruction of our city after the earthquake.

The process continues to thrive, and found positive data periodically.

This progress is very good news for our city in all its aspects, and from the Council we will continue urging the maximum shortening the period within which the relevant licenses are granted, as we have achieved so far.

We must remember that with these new building permits in the number of housing reconstruction reaches 490.

Manzanera peñarrubia explained that it is the licensing for the start of construction for the rebuilding of a block of flats that had to be demolished as a result of the damage after the earthquake registered and located in the neighborhood of La Vineyard.

We're talking about licensing for the reconstruction and expansion of the building called "Viña V", which includes re-build a total of 52 homes, assuming a total area estimated at 6461.40 m2 built.

Note that this figure includes the areas corresponding meters of underground floors.

The distribution of the property consist, according to documents submitted to the Department of Planning, in ground floor premises with a floor area of ​​39.34 m2, and 3 floors (2 basements and low).

The parking area has enough room to accommodate a total of 102 parking spaces for residents of the building, with dimensions of 3,720 m2, with 60 storage involving an area of ​​404 m2, and a number of facilities covering 243 m2.

It should specify that the said building is located on Blacksmith Street Weavers street corner.

The Town Planning explained that this property is the first of those who applied PERI which has planning permission.

The PERI was promoted by the City at the request of the Owners to facilitate its reconstruction.

This procedure has allowed homogenize the maximum height allowed in the block A Partial Plan Vine, who is 5 now, as long as the use of non-residential floor.

This is allowed in the entire block except for the area gives onto Blacksmith Street Weavers Street corner where the maximum is 4.

The height increase will allow the building to be rebuilt in a better position, eliminating the narrow mezzanine I had, which had a height ranging between 1.2 and 1.7 meters.

The mayor of Planning has reported also that since the municipal area has also been granted a license for the execution of the works in the reconstruction and expansion of the building "Marsilla" located at number 14 on the eponymous street.

The property has been licensed to rebuild 12 homes, which represents a floor area of ​​1107.80 m2, and ground floor for 12 parking spaces, with a floor area of ​​414.60 m2 (including a specific reserve space debris).

We're talking about the first license for reconstruction of a building with protection two included in the PEPRI, specifically on your block 13, farm 9.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información