Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The full City Council administrative procedures for reconstruction of all buildings demolished as a result of earthquakes in the neighborhood of La Viña (05/07/2013)

Licensing for the rebuilding of housing blocks "Granada" and "Tanners", recently granted contemplates the re-raise another 60 floors.

The Town Planning Council of Lorca, José Joaquín Peñarrubia, reported that the Planning area city council has completed the appropriate administrative procedures for the reconstruction of all the buildings in the neighborhood of La Viña that had to be demolished as a result of the serious earthquake of 2011.

Manzanera peñarrubia explained that "we are talking about good news in every way, since the neighborhood is considered ground zero of earthquakes. From City congratulations to all the neighbors who have managed, thanks to their efforts and ability to reach consensus, that the reconstruction of these blocks of flats is now a reality. believe that this advance in the recovery process of our city is encouraging, and makes us hope for the urban scars left on that earthquakes The Vineyard is being erased gradually. The fact that it has been achieved in just over two years all buildings completed administrative actions to rebuild certifies that the rebuilding process moves at a good pace, and the neighboring places of this neighborhood as an example to follow by the entire society Lorca. This achievement also notes the special interest of the residents of the Vineyard by getting your neighborhood back up and recover its social dynamism as soon as possible, a task that the City Council have always supported. since Urbanism area have been with neighbors to help in any way we could, accelerating the most of the processing of permits and licenses necessary. Achieving this milestone in the reconstruction of the municipality evidence further that teamwork pays off.'re all aware that there is much to do, and we will continue working in the same direction.

The mayor explained that Planning has been this week when completed chapter of the administrative processing of all buildings demolished in the Vineyard.

Procedures that have been rubricaban this advance licensing for the reconstruction of a battery of 60 homes, belonging to 2 blocks.

These buildings "," Granada "and" Tanners. "In the first case we are talking about a block of flats consisting of 48 floors, Local downstairs and 2 levels of basement intended for use as parking for residents in the same building. This building is located on Avenida Health, taking the numbers 2 and 4. Regarding the block called "Tanners" is a property for which license has been granted regarding the construction of 5 plants, and another aimed at basement. This block will house a total of 12 homes, with a floor area of ​​1231.57 m2. The building is located in Tanners Street No. 2, adjacent to Avenue and Street Health Shoemakers.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información