Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The PSOE requires the PP to be present once the Plan of Rehabilitation of the Historic and not run the Department of Heritage (20/11/2015)

While the historic center of Lorca is "frank critical situation and risk of disappearing," the PEPRI still not submitted despite being awarded a Valencian company more than a year ago.

Councilman Municipal Socialist Group, David Romera has claimed that "if the heart and soul of Lorca has been its old town, Lorca is losing its heart and soul" meaning that due to neglect it presents, "the Old Town is in a critical situation and frank disappearance, being a very degraded space architecturally, with empty and obsolete areas without services, without commercial establishments, with a high degree of depopulation and dilapidated urban spaces and architecture fossilized ".

David Romera says that the earthquake of May 11, 2011 "gave the lace" this monumental Lorca area, according to the Socialist councilor "comprehensive actions need recovery and especially of urgency."

Nevertheless, the socialist mayor believes that "it seems that the PP is not the work of recovering the historic center outside the restorations carried out by the Master Plan, and come to act on buildings that were in good condition before of earthquakes. "

Proof of this is that "the drafting of the new PEPRI, one of the instruments necessary to enable that recovery, is paralyzed even though the award of the new document was produced over a year ago."

"A process of awarding, by the way, that also presaged that is adopted with success and we are in this situation," he adds.

David Romera wanted to do memory to recall that in November 2014 the City Council awarded a company of Valencian origin drafting a new PEPRI, with a deadline of five months, which last April was fulfilled.

Nevertheless, the document was not submitted.

According to the councilor of the Socialist Group, "the company was not ready from a technical and operational perspective because it was awarded to the company offering the lowest technical score as it was also the cheapest (with a drop of more than 50% of bidding price) ".

Today, just as it did the PSOE as it expired in April 2015, the Socialists again insist that the contract is terminated in order to save our historic quarter of its irreversible ruin.

To do this, David Romera proposed that "a new call well in which technical aspects prevail on the price, of course without having to indemnify the contractor because he has not fulfilled the requirements of the contract is made; either this document end if it has been drafted, which all ignore ".

The PSOE negative values ​​the role of the new Department of Heritage and says that the group is not its role.

In this sense, the PSOE requires the mayor of Lorca, Francisco Jodar, to launch "once" the Department of Heritage, so far "has not done anything to promote and restore the historic center" .

David Romera said that "not even been concerned owner, Francisco Garcia, for example, to demand, taking advantage of the development works in some streets of the old town, to bury the unsightly overhead wiring".

Therefore, from the PSOE require Mr. Garcia "to focus on working" to recover the historic grounds, to take decisions immediately and to submit the final document of PEPRI that takes six months late or done a new call, it is vital to start the full recovery of the monumental area of ​​our city document, and does not waste time making spokesman for the PP and discrediting the opposition with arguments and nonsense that no one among his peers dare to take ".

Source: PSOE Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información